Projects
A package of working design documentation has been prepared; first stage of installation works is completed.
December 2013
The project is structured cabling system and the control system access to the building.
December 2008
Made design, installation and commissioning work on the creation of low-voltage systems
February 2008
Projects have been developed and carried out the installation of engineering systems of the building.
December 2007
A project, carried out installation and conducted commissioning of structured cabling systems.
September 2007