Projects


Comprehensive cancer center computerization
2000-2014
A package of working design documentation has been prepared; first stage of installation works is completed.
December 2013
A project carried out installation and commissioning of a structured cabling system.
February 2009
A project, carried out installation and conducted commissioning.
December 2008
The project is structured cabling system and the control system access to the building.
December 2008
Project, installation and commissioning.
October 2008
A project, carried out installation and conducted commissioning access control.
September 2008
A project, carried out installation and conducted commissioning.
April 2008
Made design, installation and commissioning work on the creation of low-voltage systems
February 2008
Projects have been developed and carried out the installation of engineering systems of the building.
December 2007
A project, carried out installation and conducted commissioning of structured cabling systems.
September 2007
Introduced Radiological digital information system with the image backup module (RIS + PACS)
June 2004