A project carried out installation and commissioning of a structured cabling system.
February 2009
February 2009
A package of working design documentation has been prepared; first stage of installation works is completed.
July 2009
A project, carried out installation and conducted commissioning.
December 2008
The project is structured cabling system and the control system access to the building.
December 2008
The project "Automated system of remote telemedical consultations"
November 2008
Project, installation and commissioning.
October 2008
A project, carried out installation and conducted commissioning access control.
September 2008
A project, carried out installation and conducted commissioning.
April 2008
Made design, installation and commissioning work on the creation of low-voltage systems
February 2008